Major progress

This past weekend my dad came over to give me a hand on framing the deck. As you can see from the picture, we got the job done. Within three hours, the frame and inner joists were in place and waiting for the top to be attached.

But before the top boards can be screwed on, I’ve got to get more gravel into the pit. That means hauling ten bags of gravel at a time from Lowes in the trunk of my Mazda. So if I’m able to make enough trips to Lowes this week, I could be putting the top boards on the deck by this weekend.

Leave a Reply